Start Date:
2010-07-09
End Date:
2010-07-14
 
Task Summary:
Tanks
Original Comment:
prepare 4 tanks with valves and feeding tubes.
1X tank for raw material with mixing machanism (steel barrel).
2X gas tanks (steel barrels).
1X water level (plastic drum?)
Assigned to
None
Dependent on task
Hours
96
Status
Deleted
 
Field Old Value Date By
status_id 1 2011-10-26 20:29 poolover